Jobs/day per electrician, avg ticket (£140–£4,400), NICEIC / NAPIT membership, EICR landlord cert volume, EV charger + solar + battery share, smart-home install share, recurring landlord-portfolio contracts.
A UK independent electrical contractor running domestic rewires, EICR landlord certs, EV charger installs, consumer unit upgrades and small-commercial work. The 2026 win is the EV charger + solar PV + battery storage stack — government incentives + heat-pump boom are pulling £4k–£14k ticket installs into the mainstream.

A UK indie electrical contractor in 2026 runs five engines: domestic + small-commercial general (£140–£640 ticket, 58–68% margin, 8–14/week per electrician — sockets, switches, lighting, faults), EICR + landlord certs (£140–£280 per cert, 72–82% margin, 22–48/week — driven by 5-year landlord legal cycle), consumer unit + rewire (£640–£4,400 ticket, 38–48% margin, 2–4/week), EV charger installs (£480–£1,400 per charger after OZEV £350 grant, 38–48% margin, 8–18/week and growing fast), and solar PV + battery (£6,400–£14,000 per install, 22–32% margin, 1–3/week). Maths for 3-electrician crew: £24k general + £14k EICR + £18k consumer unit + £18k EV + £14k solar = £88k/month gross. The 2026 strategy is the EV + solar + battery stack — Octopus Energy + Ohme + Tesla Powerwall partnerships turn a £480 EV install into a £14k whole-home energy upgrade.
Sized for a 2–4 chair shop. Buy mid-range on chairs and clippers; cheap kit fails inside 12 months and walks away with your barbers.
Travel kills margin. 30-min cap to most jobs.
Cable + MCBs + consumer units holding.
Mixed install + EICR + EV + solar demand.
Daily trade-counter runs.
Yard + parts holding > retail frontage.
UK figures for 2026. Lead times assume you submit complete applications — councils will pause the clock if you miss documents.
Illustrative planning ranges, not measured customer data. Toggle the views to see ramp, mix and weekly load.
Illustrative example for planning, not measured customer data.
Soft open: 3 EICRs, 1 EV charger install, 2 fault call-outs, £1.4k revenue.
First week: 18 EICRs, 4 EV chargers (£3.4k), 8 general jobs, £12k revenue.
Steady: 96 jobs, 18 EV chargers, 2 consumer unit upgrades, £52k revenue. NICEIC audit passed.
Full ramp: £82k/month, 4 landlord contracts (480 properties), first solar + battery install delivered.
Mature: £108k/month, 12 solar + battery installs, 32 EV chargers/month. EV + solar mix at 38%.
Jobs/day per electrician, avg ticket (£140–£4,400), NICEIC / NAPIT membership, EICR landlord cert volume, EV charger + solar + battery share, smart-home install share, recurring landlord-portfolio contracts.
NICEIC Approved Contractor + EV / PV / battery competent person scheme, partner with Ohme + Hypervolt + EO + Pod Point for OZEV-grant EV chargers, sign 6–10 landlord-portfolio contracts for EICRs (£140/cert × 30/month per contract), launch a solar + battery + EV bundle for new-build customers.
Engineer dispatch by certification, ETA SMS, EICR renewal reminders (5-year), test-result PDF auto-dispatch to landlord, BiKBBI / NICEIC compliance log automation, OZEV grant claim submission.
Commusoft / Powered Now job management, Stripe, Klaviyo, GBP, NICEIC online certification portal, OZEV / MCS portal, Xero.
Jobs/day, EV + solar mix and landlord contract share vs NICEIC / NAPIT approved contractor cohort.
Encore advisors from Electrical Contractors Association (ECA), NICEIC, ex-NAPIT senior assessors and Tesla / Octopus Energy install partners.
Start your free trial and the electrical service playbook loads on day one.